Interface: Idaho State Police Regional Communications Center South - Idaho Transportation Department District 3 Maintenance Shop

Idaho State Police Regional Communications Center South to Idaho Transportation Department District 3 Maintenance Shop Interface Diagram

Architecture Flow Definitions

emergency traffic coordination  (Existing)  Applicable ITS Standards

Coordination supporting disaster response including evacuation and reentry. Includes coordination of special traffic control strategies that support efficient evacuation and reentry while protecting and optimizing movement of response vehicles and other resources responding to the emergency.

incident information for public  (Existing)  Applicable ITS Standards

Report of current desensitized incident information prepared for public dissemination.

incident response status  (Planned)  Applicable ITS Standards

Status of the current incident response including a summary of incident status and its impact on the transportation system, traffic management strategies implemented at the site (e.g., closures, diversions, traffic signal control overrides), and current and planned response activities.

maint and constr resource request  (Existing)  Applicable ITS Standards

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre–staging, staging, or immediate dispatch of resources.

maint and constr resource response  (Existing)  Applicable ITS Standards

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

resource deployment status  (Planned)  Applicable ITS Standards

Status of resource deployment identifying the resources (vehicles, equipment, materials, and personnel) available and their current status. General resource inventory information and specific status of deployed resources may be included.

resource request  (Planned)  Applicable ITS Standards

A request for resources to implement special traffic control measures, assist in clean up, verify an incident, etc. The request may poll for resource availability or request pre–staging, staging, or immediate deployment of resources. Resources may be explicitly requested or a service may be requested and the specific resource deployment may be determined by the responding agency.

road network conditions  (Existing)  Applicable ITS Standards

Current and forecasted traffic information, road and weather conditions, and other road network status. Either raw data, processed data, or some combination of both may be provided by this flow. Information on diversions and alternate routes, closures, and special traffic restrictions (lane/shoulder use, weight restrictions, width restrictions, HOV requirements) in effect is included.

road network status assessment  (Existing)  Applicable ITS Standards

Assessment of damage sustained by the road network including location and extent of the damage, estimate of remaining capacity, required closures, alternate routes, necessary restrictions, and time frame for repair and recovery.

traffic control information  (Existing)  Applicable ITS Standards

Represents the flow of traffic control and status information from a TMC to a third party TIC. This is reporting only, not actual control.

traffic images  (Planned)  Applicable ITS Standards

High fidelity, real–time traffic images suitable for surveillance monitoring by the operator or for use in machine vision applications. This flow includes the images and meta data that describes the images.