Interface: Idaho Transportation Department District 3 Maintenance Shop - Treasure Valley Regional Maintenance and Construction Event Clearinghouse

Idaho Transportation Department District 3 Maintenance Shop to Treasure Valley Regional Maintenance and Construction Event Clearinghouse Interface Diagram

Architecture Flow Definitions

archive requests  (Existing)  Applicable ITS Standards

A request to a data source for information on available data (i.e., "catalog") or a request that defines the data to be archived. The request can be a general subscription intended to initiate a continuous or regular data stream or a specific request intended to initiate a one–time response from the recipient.

archive status  (Existing)  Applicable ITS Standards

Notification that data provided to an archive contains erroneous, missing, or suspicious data or verification that the data provided appears valid. If an error has been detected, the offending data and the nature of the potential problem are identified.

archived data product requests  (Existing)  Applicable ITS Standards

A user–specified request for archived data products (i.e., data, meta data, or data catalogs). The request also includes information that is used to identify and authenticate the user and support electronic payment requirements, if any.

archived data products  (Existing)  Applicable ITS Standards

Raw or processed data, meta data, data catalogs and other data products provided to a user system upon request. The response may also include any associated transaction information.

current infrastructure restrictions  (Existing)  Applicable ITS Standards

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

emissions archive data  (Planned)  Applicable ITS Standards

Air quality and vehicle emissions information that is collected by sensors or derived from models. Content may include a catalog of available information, the actual information to be archived, and associated meta data that describes the archived information.

equipment maintenance request  (Existing)  Applicable ITS Standards

Identification of field equipment requiring repair and known information about the associated faults.

equipment maintenance status  (Existing)  Applicable ITS Standards

Current status of field equipment maintenance actions.

incident information  (Existing)  Applicable ITS Standards

Notification of existence of incident and expected severity, location, time and nature of incident. As additional information is gathered and the incident evolves, updated incident information is provided. Incidents include any event that impacts transportation system operation ranging from routine incidents (e.g., disabled vehicle at the side of the road) through large–scale natural or human–caused disasters that involve loss of life, injuries, extensive property damage, and multi–jurisdictional response. This also includes special events, closures, and other planned events that may impact the transportation system.

maint and constr archive data  (Existing)  Applicable ITS Standards

Information describing road construction and maintenance activities identifying the type of activity, the work performed, and work zone information including work zone configuration and safety (e.g., a record of intrusions and vehicle speeds) information. For construction activities, this information also includes a description of the completed infrastructure, including as–built plans as applicable. Content may include a catalog of available information, the actual information to be archived, and associated meta data that describes the archived information.

maint and constr resource coordination  (Existing)  Applicable ITS Standards

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response.

maint and constr resource request  (Existing)  Applicable ITS Standards

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre–staging, staging, or immediate dispatch of resources.

maint and constr resource response  (Existing)  Applicable ITS Standards

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

maint and constr work plans  (Existing)  Applicable ITS Standards

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

traffic archive data  (Existing)  Applicable ITS Standards

Information describing the use and vehicle composition on transportation facilities and the traffic control strategies employed. Content may include a catalog of available information, the actual information to be archived, and associated meta data that describes the archived information.

traveler archive data  (Planned)  Applicable ITS Standards

Data associated with traveler information services including service requests, facility usage, rideshare, routing, and traveler payment transaction data. Content may include a catalog of available information, the actual information to be archived, and associated meta data that describes the archived information.

work plan coordination  (Existing)  Applicable ITS Standards

Coordination of work plan schedules and activities between maintenance and construction organizations or systems. This information includes the work plan schedules and comments and suggested changes that are exchanged as work plans are coordinated and finalized.

work plan feedback  (Existing)  Applicable ITS Standards

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.