Interface: County 911 Centers - Idaho Transportation Department District 3 Maintenance Shop

County 911 Centers to Idaho Transportation Department District 3 Maintenance Shop Interface Diagram

Architecture Flow Definitions

alert status  (Planned)  Applicable ITS Standards

Information indicating the current status of the emergency alert including identification of the traveler and driver information systems that are being used to provide the alert.

current infrastructure restrictions  (Existing)  Applicable ITS Standards

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

emergency plan coordination  (Planned)  Applicable ITS Standards

Information that supports coordination of emergency management plans, continuity of operations plans, emergency response and recovery plans, evacuation plans, and other emergency plans between agencies. This includes general plans that are coordinated prior to an incident and shorter duration tactical plans that are prepared during an incident.

emergency traffic control information  (Planned)  Applicable ITS Standards

Status of a special traffic control strategy or system activation implemented in response to an emergency traffic control request, a request for emergency access routes, a request for evacuation, a request to activate closure systems, a request to employ driver information systems to support public safety objectives, or other special requests. Identifies the selected traffic control strategy and system control status.

emergency traffic control request  (Planned)  Applicable ITS Standards

Special request to preempt the current traffic control strategy in effect at one or more signalized intersections or highway segments, activate traffic control and closure systems such as gates and barriers, activate safeguard systems, or use driver information systems. For example, this flow can request all signals to red–flash, request a progression of traffic control preemptions along an emergency vehicle route, request a specific evacuation traffic control plan, request activation of a road closure barrier system, or place a public safety or emergency–related message on a dynamic message sign.

evacuation information  (Planned)  Applicable ITS Standards

Evacuation instructions and information including evacuation zones, evacuation times, and reentry times.

incident information for public  (Existing)  Applicable ITS Standards

Report of current desensitized incident information prepared for public dissemination.

incident response status  (Planned)  Applicable ITS Standards

Status of the current incident response including a summary of incident status and its impact on the transportation system, traffic management strategies implemented at the site (e.g., closures, diversions, traffic signal control overrides), and current and planned response activities.

maint and constr resource request  (Existing)  Applicable ITS Standards

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre–staging, staging, or immediate dispatch of resources.

maint and constr resource response  (Existing)  Applicable ITS Standards

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

maint and constr work plans  (Existing)  Applicable ITS Standards

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

remote surveillance control  (Planned)  Applicable ITS Standards

The control commands used to remotely operate another center's sensors or surveillance equipment so that roadside surveillance assets can be shared by more than one agency.

resource deployment status  (Planned)  Applicable ITS Standards

Status of resource deployment identifying the resources (vehicles, equipment, materials, and personnel) available and their current status. General resource inventory information and specific status of deployed resources may be included.

resource request  (Planned)  Applicable ITS Standards

A request for resources to implement special traffic control measures, assist in clean up, verify an incident, etc. The request may poll for resource availability or request pre–staging, staging, or immediate deployment of resources. Resources may be explicitly requested or a service may be requested and the specific resource deployment may be determined by the responding agency.

road weather information  (Existing)  Applicable ITS Standards

Road conditions and weather information that are made available by road maintenance operations to other transportation system operators.

traffic images  (Planned)  Applicable ITS Standards

High fidelity, real–time traffic images suitable for surveillance monitoring by the operator or for use in machine vision applications. This flow includes the images and meta data that describes the images.

transportation system status  (Planned)  Applicable ITS Standards

Current status and condition of transportation infrastructure (e.g., tunnels, bridges, interchanges, TMC offices, maintenance facilities). In case of disaster or major incident, this flow provides an assessment of damage sustained by the surface transportation system including location and extent of the damage, estimate of remaining capacity and necessary restrictions, and time frame for repair and recovery.

work plan feedback  (Existing)  Applicable ITS Standards

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.

work zone information  (Existing)  Applicable ITS Standards

Summary of maintenance and construction work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.