Interface: Treasure Valley Regional Maintenance and Construction Event Clearinghouse - County and Municipal Public Safety Dispatch Centers

Treasure Valley Regional Maintenance and Construction Event Clearinghouse to County and Municipal Public Safety Dispatch Centers Interface Diagram

Architecture Flow Definitions

current infrastructure restrictions  (Existing)  Applicable ITS Standards

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

incident information  (Existing)  Applicable ITS Standards

Notification of existence of incident and expected severity, location, time and nature of incident. As additional information is gathered and the incident evolves, updated incident information is provided. Incidents include any event that impacts transportation system operation ranging from routine incidents (e.g., disabled vehicle at the side of the road) through large–scale natural or human–caused disasters that involve loss of life, injuries, extensive property damage, and multi–jurisdictional response. This also includes special events, closures, and other planned events that may impact the transportation system.

incident response status  (Existing)  Applicable ITS Standards

Status of the current incident response including a summary of incident status and its impact on the transportation system, traffic management strategies implemented at the site (e.g., closures, diversions, traffic signal control overrides), and current and planned response activities.

maint and constr resource request  (Existing)  Applicable ITS Standards

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre–staging, staging, or immediate dispatch of resources.

maint and constr resource response  (Existing)  Applicable ITS Standards

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

maint and constr work plans  (Existing)  Applicable ITS Standards

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

work plan feedback  (Existing)  Applicable ITS Standards

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.